Ultra Swift run start, O4 final
The Ultra Swift project will be an attempt to point Swift with prototype O5 infrastructure and early warning inspiral pipeline. The O5 technology components being prototyped are:
- arrakis data distribution and stream processing system
- sgn-cal next-gen calibration pipeline
- sgnl inspiral pipeline
- prototype alert systems The project will begin when O4 resumes after the spring commissioning break, on June 4, 2025.
So we need to have a version of the calibration pipeline running in "production" on O4 data by June 4.