  • Pronto: Check geometry and compute expected angles and beam offsets from re angling of cavities rel to window wedge
  • Assemble gear for venting, talk to koji about experience doing it last time
  • Turbo+roughing pump from cryo
  • Test Pb97.5Ag1.5Sn1 solder on Kapton heaters
  • Test theory that PID has rounding error leak from finite difference method
  • Blurb for LIGOX website
  • Test torque wrenches, buy hex key attachments if we don't have
  • Fix beam dumping around south Refl PD
  • ISS build assembly of duel beam configuration
  • Clone acromag1 onto external HD
  • Clipping mechanism for cavity shield temperature sensors + glue and bake test of varnish/glue Vge7431 lakeshore
  • Make plans for testing transmission PZT ditherer
  • Systematic method for tuning cavity shield heater PID
  • Make LISO model of our homemade RFPDs
  • Model and measure higher order mode laser power

Back burner:

  • Noise budget for PLL
  • Gather files for new ISS boards make assembly for double beam. (awade)
  • Find systematic way of tuning NCav heater PID
  • Model of PID loop and the cavity+heater
  • Replace post cavity BN \lambda/2 plates with large aperture ones (maybe clean ones from zach's ATF lab stash), use solid mount
  • Rb clock measurement of Marconi noise floor
  • (Buy) Torque wrenches ~ 6 pound foot, first test with variable wrenches
  • High pressure hose snap together 1x1s

Done:

  • Post long term temperature trends from Framebuilder
  • Re configure can heater for lower resistance
  • Pronto: Diagnose coupling of heater driver to temp sensors
  • Clean and bake black glass beam dumps (2 days min)