... | ... | @@ -16,29 +16,37 @@ We will be having a face-to-face meeting at LHO the last week of July. |
|
|
- Lilli Sun (Remote only; Mon-Thu afternoons)
|
|
|
- Hsiang-Yu Huang(Remote only)
|
|
|
|
|
|
## Agenda (draft - please feel free to edit):
|
|
|
## Proposed agenda:
|
|
|
|
|
|
This is mainly following the steps and TODOs in [this document](https://docs.google.com/document/d/1CEaU3xtMrqzJ_k96ElEcpleHRD6t9VuJEJQ8b-fqTsk/edit?usp=sharing).
|
|
|
This is main topic of this meeting will be the [C00 Calibration procedure](https://docs.google.com/document/d/1CEaU3xtMrqzJ_k96ElEcpleHRD6t9VuJEJQ8b-fqTsk/edit?usp=sharing). We will be fleshing out the procedure, as well as spend as much time as possible actually working on implementing the needed components.
|
|
|
|
|
|
### Monday 7/25
|
|
|
|
|
|
- Overview and recap of proposed C00 procedure.
|
|
|
- Measurements required in order to achieve the goal (what type, how long, and when) [and other things in Step 2]
|
|
|
|
|
|
***Tuesday 7/26***
|
|
|
### Tuesday 7/26
|
|
|
|
|
|
- How to calculate the C00 uncertainty; criteria to "accept" or not; what to do if not acceptable [and other things in Step 3]
|
|
|
- C00 uncertainty calculation
|
|
|
- criteria to "accept" calibration [step 3]
|
|
|
- what to do if not acceptable
|
|
|
|
|
|
***Wednesday 7/27***
|
|
|
### Wednesday 7/27
|
|
|
|
|
|
- Continuously monitoring the calibration (how, where to host the job, what to do when things are out-of-bounds)
|
|
|
- downstream pipeline components (DMT/GDS)
|
|
|
- modifications to gstlal-calibration
|
|
|
- analytic TDCF
|
|
|
- error compensation
|
|
|
- Continuous monitoring
|
|
|
- how, where to host the job, what to do when things are out-of-bounds, etc.
|
|
|
- Coordination between new monitoring and the O3 procedure being resurrected at Caltech
|
|
|
|
|
|
***Thursday 7/28***
|
|
|
### Thursday 7/28
|
|
|
|
|
|
- What else does gstlal need from pydarm; output configurations [Step 4]
|
|
|
- Pipeline restarting procedure [Step 5]
|
|
|
- O4 plans for FE calibration and gstlal calibration (GDS/DCS) pipeline
|
|
|
|
|
|
***Friday 7/29***
|
|
|
### Friday 7/29
|
|
|
|
|
|
- Closing/AOB/working sessions |