... | ... | @@ -22,30 +22,31 @@ This is main topic of this meeting will be the [C00 Calibration procedure](https |
|
|
|
|
|
### Monday 7/25
|
|
|
|
|
|
- Overview and recap of proposed C00 procedure.
|
|
|
- Overview of proposed C00 procedure
|
|
|
- Measurements required in order to achieve the goal (what type, how long, and when) [and other things in Step 2]
|
|
|
|
|
|
### Tuesday 7/26
|
|
|
|
|
|
- C00 uncertainty calculation
|
|
|
- criteria to "accept" calibration [step 3]
|
|
|
- Criteria to "accept" calibration [step 3]
|
|
|
- what to do if not acceptable
|
|
|
|
|
|
### Wednesday 7/27
|
|
|
|
|
|
- downstream pipeline components (DMT/GDS)
|
|
|
- modifications to gstlal-calibration
|
|
|
- analytic TDCF
|
|
|
- work on gstlal-calibration DMT/GDS pipeline
|
|
|
- status of proposed modifications
|
|
|
- analytic TDCFs
|
|
|
- error compensation
|
|
|
- Continuous monitoring
|
|
|
- how, where to host the job, what to do when things are out-of-bounds, etc.
|
|
|
- Coordination between new monitoring and the O3 procedure being resurrected at Caltech
|
|
|
- what's needed from pydarm
|
|
|
- pipeline restart procedure
|
|
|
|
|
|
- status of front-end calibration model
|
|
|
|
|
|
### Thursday 7/28
|
|
|
|
|
|
- What else does gstlal need from pydarm; output configurations [Step 4]
|
|
|
- Pipeline restarting procedure [Step 5]
|
|
|
- O4 plans for FE calibration and gstlal calibration (GDS/DCS) pipeline
|
|
|
- Continuous monitoring
|
|
|
- how, where to host the job, what to do when things are out-of-bounds, etc.
|
|
|
- Coordination between new monitoring and the O3 procedure being resurrected at Caltech
|
|
|
|
|
|
### Friday 7/29
|
|
|
|
... | ... | |