Create 021323 authored by Rebecca Ewing's avatar Rebecca Ewing
# GstLAL West Dev Agenda - 02/13/23
## Road Map
Link to GstLAL road map document: [roadmap](https://docs.google.com/document/d/1aZq8htOCd9WlUqpofcoa72Mtp6vfE5oDUc-pYSXGso8/edit?usp=sharing)
## Chair
Becca
## Minute Taker
Prathamesh
Char / Minute Taker / Focus Session [Rota](https://git.ligo.org/groups/gstlal/-/wikis/West-call/Rota-table)
## Action Items for next week
(**Leave action items here for next week.**)
## Last week's call
* [ ] Assigned to Cort/Leo : get the "file list too large" fixing commit on O4-offline-dev merged into master
:arrow_forward: Leo brought this up to Kipp in East Call 2 weeks ago. Kipp was ok with fixing the bug, but wants to rethink current option to disable VT jobs. Blocked by Kipp. Might be done in 2 weeks. :arrow_right: Leo will bring up in east call this week to get it under Kipp’s radar
* [ ] Surabhi, Divya: Double check with Brockhill on how to go about just in time injections :arrow_right: Divya will contact Brockhill
* [ ] Leo, Becca, Divya, Rachael: Look at dist_stats file size and make sure it is what is expected and whether it is contributing to high RAM usage :arrow_right: follow up needed. More in minutes
* [ ] Chad: catch up with Ron about figuring out configuration of ICDS for real data analysis
* [ ] Becca: go to East call and get the open MR merged before MDC 11.
* [ ] Rachel: MDC documentation needs to be updated since a lot of documentation is missing/wrong. We want to do this before tmr’s sprint
* [ ] Rachel: add task to this week's MDC rota to look into [this issue]( https://gstlal.ligo.caltech.edu/grafana/d/h7V_Xxn4k/early-warning-dashboard?orgId=1&var-ginterval=100s&var-DashDatasource=ew_replay_MDC10&var-fmax=All&from=1675555200000&to=1675688399000)
* [ ] Becca: notify ppl in detchar call and LL call about the superevent consolidation dashboard
## Agenda / Minutes
* Announcements (5 minutes)
- Please check the rota for next week's call
- Confirmation of next week's focus session
* Last week's East call - [agenda](https://wiki.ligo.org/CBC/Searches/GstLALEastAgenda20230209)
* Quick updates (45 minutes)
- Operations (5 minutes)
- LL CBC operations
- LL IDQ operations
- O4 Dev (30 minutes)
- Low latency integrated testing and Monitoring
- Template bank
- Likelihood ratio, background and foreground sampling
- Injection file format
- offline DAG
- DQ dev
- HM search
- Exploratory development (5 minutes)
- Misc projects
- Paper Updates
* Focus session
- **ADDME**
* AOB
## Chat log
\ No newline at end of file