Adding H1_calibration.yml and L1_calibration.yml as install targets to fix build

14 jobs for master in 30 minutes and 8 seconds (queued for 5 seconds)
Status Job ID Name Coverage
  Level0
passed #422614
level0:gstlal

00:02:25

passed #422613
level0:rpm:gstlal

00:03:34

 
  Level1
passed #422616
level1:gstlal-ugly

00:01:56

passed #422615
level1:rpm:gstlal-ugly

00:03:04

 
  Level2
passed #422622
level2:gstlal-burst

00:00:54

passed #422620
level2:gstlal-calibration

00:01:29

passed #422621
level2:gstlal-inspiral

00:02:15

passed #422619
level2:rpm:gstlal-burst

00:01:27

failed #422618
allowed to fail
level2:rpm:gstlal-calibration

00:02:45

passed #422617
level2:rpm:gstlal-inspiral

00:06:00

 
  Test Gstlal
passed #422623
test:gstlal

00:00:28

 
  Test Inspiral
passed #422624
test:gstlal-inspiral

00:00:29

 
  Test Burst
passed #422625
test:gstlal-burst

00:00:23

 
  Test Offline
failed #422626
allowed to fail
test:offline

00:16:05

 
Name Stage Failure
failed
test:offline Test Offline
user 0.72
sys 0.09
make: *** [H1L1-0000_CALC_RANK_PDFS-1000000000-2048.xml.gz] Error 1
Daemon already running on PID 7
Uploading artifacts...
WARNING: gstlal-inspiral/tests/WEBDIR/gstlal_offline_tutorial: no matching files
public: found 1 matching files

Uploading artifacts to coordinator... ok
id=422626 responseStatus=201 Created token=HKDVa2C-
ERROR: Job failed: exit code 1
failed
level2:rpm:gstlal-calibration Level2
   /usr/share/gstlal/L1_calibration.yml


RPM build errors:
Installed (but unpackaged) file(s) found:
/usr/share/gstlal/H1_calibration.yml
/usr/share/gstlal/L1_calibration.yml
Daemon already running on PID 7
ERROR: Job failed: exit code 1