mass ratio and time-in-each-ifo
While mass ratio is present in the summaries, the convention usually used in PE results is q<1 (ie m2/m1) however the current display is q>1. The PE choice q<1 has the advantage that the range that needs to be displayed is bounded & can be taken always the same.
As discussed on Mattermost, I'm also requesting time-in-H,L,V as parameters.