|
|
This page is for a top-level control of all the ongoing activities. Avoid adding low-level details which can be added as additional pages linked from here. At present, we think of three follow-up studies to be concluded in the next three months. The plans are below
|
|
|
|
|
|
# Inference on the population of BBH or BH mimicker binaries
|
|
|
[Dedicated page](SIQM-population-inference)
|
|
|
|
|
|
# Stealth/systematic biases in the compact binary parameter estimation due to spin induced moments.
|
|
|
|
|
|
# Measuring spin induced deformations for signals with significant higher harmonics
|
|
|
|
|
|
|
|
|
# Action items (currently unfinished)
|
|
|
|
|
|
* Krishnendu: submit all the 01-o2 events for imr case
|
|
|
* Saleem: using simple combining produced no. of events v/s bounds plot (use 1k events by simple scaling)
|
|
|
* Saleem: Repeat the same in the hierarchical framework
|
|
|
|
|
|
BBH v/s non-BBH population
|
|
|
* Assume a mixture population: constrain the fraction f of BBHs (show f peaks at 1?)
|
|
|
|
|
|
Stealth bias:
|
|
|
* Krishnendu/Saleem: Launch runs
|
|
|
* Krishnendu: Revisit the basic idea and get a rough draft
|
|
|
* Saleem: Push all the remaining stuff
|
|
|
* Precession higher modes
|
|
|
* Saleem: circulate existing results with main conclusions
|
|
|
* Krishnendu/Saleem: Two higher mode runs; exceptional events
|
|
|
* Krishnendu: Check bilby
|
|
|
* Krishnendu/Saleem: Decide on the injections and finish jobs, make inference
|
|
|
* Make a draft! |