Update Result Review O4a authored by Srashti Goyal's avatar Srashti Goyal
......@@ -50,20 +50,20 @@ The review call happen on Wednesdays 1 PM CEST/ 4:30 PM IST virtual IFPA room: h
* We discussed the plan and action items for finalising the machine for production run.
- PSD for training and testing.
- Population: astro (haris et al 1400+1400) , astro (O4) v/s uniform (8000+8000) v/s ensembling
- training set size, Overfitting and optimization, variance.
- Subthreshold: ROCs, single det > 4
- Detectors H L and H L V ?
- Generate Background (later)
- Noise: Gaussian v/s real (O4b)
- PSD for training and testing.
- Population: astro (haris et al 1400+1400) , astro (O4) v/s uniform (8000+8000) v/s ensembling
- training set size, Overfitting and optimization, variance.
- Subthreshold: ROCs, single det > 4
- Detectors H L and H L V ?
- Generate Background (later)
- Noise: Gaussian v/s real (O4b)
* We discussed the Data Preparation steps for O4a real events
- Event list (CBCFlow)
- Downloading to frame files, skymaps
- Config for running ML
- Fixing the Passing criteria (top 1 %)
- Event list (CBCFlow)
- Downloading to frame files, skymaps
- Config for running ML
- Fixing the Passing criteria (top 1 %)
### Action items:
......
......