Todo items for this week:
-
SURF selection -
Pronto: Check geometry and compute expected angles and beam offsets from re angling of cavities rel to window wedge -
Assemble gear for venting, talk to koji about experience doing it last time -
Turbo+roughing pump from cryo -
Blurb for LIGOX website -
Fix ghost beams reflecting from south Faraday -
ISS build assembly of duel beam configuration -
Clipping mechanism for cavity shield temperature sensors + glue and bake test of varnish/glue Vge7431 lakeshore -
Testing transmission PZT ditherer -
Systematic method for tuning cavity shield heater PID -
Revive LISO model of our homemade RFPDs -
FSS noise budget -
Wrap up lab before maintenance next week
Back burner:
-
Noise budget for PLL -
Solid works assembly for ISS boards: double beam. (awade) -
Model of PID loop and the cavity+heater -
Rb clock measurement of Marconi noise floor -
Test new torque wrenche ~ 6 pound foot