Scheduled tests failing due to timeouts
See, e.g., https://git.ligo.org/lscsoft/bilby/pipelines/81823
We may need to split the scheduled tests up into core and gw and/or improve the container to speed things up.
Designs
- Show closed items
Activity
-
Newest first Oldest first
-
Show all activity Show comments only Show history only
- Gregory Ashton added High priority Infrastructure Testing labels
added High priority Infrastructure Testing labels
- Maintainer
Can we try removing the 150914 example to see if this is the issue? I think the most expensive part of that example is building the distance marginalisation lookup table.
- Author Maintainer
To test it, we can hack the
.gitlab-ci.yml
file to always run the scheduled test, this will then test it on the branch CI. Then, once it passes we can set if back to schedule only and merge in.Rather than remove the 150914, why not remove the
marginalized parameters
, since the 150914 already tests this (maybe?). - Maintainer
I thought the marginalised example didn't use distance marginalisation, it appears that I was mistaken.
That's a good suggestion. Do you want me to take this on?
- Maintainer
I'm happy to unless you've already started.
- Author Maintainer
I haven't started. Happy to assign it to you :)
- Gregory Ashton assigned to @colm.talbot
assigned to @colm.talbot
- Gregory Ashton changed milestone to %0.5.9
changed milestone to %0.5.9
- Gregory Ashton added 1 deleted label and removed High priority label
added 1 deleted label and removed High priority label
- Colm Talbot created merge request !611 (merged) to address this issue
created merge request !611 (merged) to address this issue
- Colm Talbot mentioned in merge request !611 (merged)
mentioned in merge request !611 (merged)
- Colm Talbot closed via merge request !611 (merged)
closed via merge request !611 (merged)
- Colm Talbot mentioned in commit 89353166
mentioned in commit 89353166
- Michael Williams unassigned @colm.talbot
unassigned @colm.talbot